Boat lift Niederfinow

The ship lift on the Oder-Havel Canal will be put into operation on March 21, 1934 with a big celebration. In an 85-meter-long trough that weighs 4300 t filled with water, the ships overcome a height difference of 36 meters. | usage worldwide